How can we consider introducing the In Mirror Coating system?
As a rough guide, an in-depth hearing is conducted, coating tests are performed, design and confirmation are made, and a contract is signed.
・We will ask about the current painting situation, problems, etc.
・We receive the coated workpiece and conduct a paint test. We will check the quality of the finish, the painting time, and the amount of paint used.
・We will ask you about installation space, production volume, equipment requirements, etc., and start designing. Upon confirmation and approval, a contract will be signed.
・Please contact our sales representative for details.
2023.01.10
If your question is not covered in the FAQ, please contact us directly via the Inquiries page.